Proven Results

Projects That Deliver Measurable Results

See how we've helped facilities across Northern Indiana reduce downtime, save energy, and improve operational efficiency through expert mechanical solutions.

Manufacturing Plant Chiller Upgrade
Manufacturing
3 weeks
Manufacturing Plant Chiller Upgrade

Challenge

Aging 400-ton chiller system causing frequent breakdowns and high energy costs at automotive parts facility.

Solution

Complete chiller replacement with high-efficiency units, upgraded controls, and preventive maintenance program.

Results

35%
Energy Savings
90%
Downtime Reduction
$52,000
Annual Savings
Food Processing Facility Refrigeration
Food & Beverage
5 weeks
Food Processing Facility Refrigeration

Challenge

Cold storage facility needed expanded refrigeration capacity while maintaining HACCP compliance and temperature consistency.

Solution

Installed new ammonia refrigeration system with advanced controls and monitoring for temperature-sensitive food storage.

Results

60%
Capacity Increase
±0.5°F
Temperature Variance
28% better
Energy Efficiency
Hospital HVAC System Modernization
Healthcare
8 weeks
Hospital HVAC System Modernization

Challenge

Regional hospital required HVAC upgrade to meet strict air quality standards while maintaining 24/7 operations.

Solution

Phased HVAC replacement with medical-grade air filtration, humidity control, and redundant systems for critical areas.

Results

99.97%
Air Quality Improvement
42%
Energy Reduction
100%
Zero Downtime
Data Center Cooling Optimization
Technology
4 weeks
Data Center Cooling Optimization

Challenge

Growing data center experiencing cooling inefficiencies and hot spots affecting server performance and reliability.

Solution

Implemented precision cooling system with hot/cold aisle containment and intelligent airflow management.

Results

45% better
Cooling Efficiency
100%
Hot Spots Eliminated
1.8 to 1.3
PUE Improvement
School District Boiler Replacement
Education
1 week
School District Boiler Replacement

Challenge

Elementary school's 30-year-old boiler system failing frequently, causing classroom heating issues during winter months.

Solution

Emergency boiler replacement with high-efficiency condensing boilers and modern control systems.

Results

Zero failures
Reliability
38%
Fuel Savings
2 days
Installation Time
Restaurant Chain HVAC Retrofit
Food Service
12 weeks
Restaurant Chain HVAC Retrofit

Challenge

Multi-location restaurant chain needed energy-efficient HVAC solutions to reduce operating costs across 12 locations.

Solution

Standardized high-efficiency HVAC systems with smart controls and centralized monitoring across all locations.

Results

31%
Energy Savings
55%
Maintenance Reduction
2.3 years
ROI Timeline

Project Success by the Numbers

Our track record speaks for itself - delivering measurable improvements across all project types.

150+

Projects Completed

35%

Average Energy Savings

85%

Downtime Reduction

$2.3M

Client Savings Generated